Asikakor Enterprises / National Hosting Authority

By: Material type: TextTextPublication details: Honiara, Solomons Islands : National Hosting Authority, 2023Subject(s): Online resources:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Shelving location Call number Materials specified Status Date due Barcode
E-File E-File NHA Pacific Games 2023 Library Secretariat eLibrary 2023 Available
Folder Folder NHA Pacific Games 2023 Library Secretariat Cabinet 19 - Drawer B 1/3/5/ASI (Browse shelf(Opens below)) 2023 Available
Browsing NHA Pacific Games 2023 Library shelves, Shelving location: Cabinet 19 - Drawer B, Collection: Secretariat Close shelf browser (Hides shelf browser)
1/3/5/ALR Alrico Timbers / 1/3/5/ALR Alrico Construction / 1/3/5/ARK ARKAD General Construction / 1/3/5/ASI Asikakor Enterprises / 1/3/5/AVC AVCON Limited / 1/3/5/B2C B2 Construction. / 1/3/5/BES Best Builders /

- Mobilization Payment 1 - 20%
- Payment 2 - (35%) of total payment for 50% Completion of work
- Payment 3 - (35%) for Completion of work
- Payment 4 Retention payment 10% after satisfaction of 3 months defect liability period

Labour Based Contract for Upgrade of Games Village for Pacific Games 2023 - GTB-GFC 09/22.
Lot 2 -King George Sixth National Secondary School - Carpentry works for Tasman Dormitory. Building 5

There are no comments on this title.

to post a comment.

Copyright @ NHA PG2023 Library
Honiara, Solomon Islands

_______________________________________________________________________________________________________

Proudly Designed And Developed by:
Umi Solomons, Honiara, Solomon Islands
Email:: info@umisolomons.com