KC Construction / National Hosting Authority

By: Material type: TextTextPublication details: Honiara, Solomons Islands : National Hosting Authority, 2023Subject(s): Online resources:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Shelving location Call number Materials specified Status Date due Barcode
Folder Folder NHA Pacific Games 2023 Library Secretariat eLibrary 2023 Available
Folder Folder NHA Pacific Games 2023 Library Secretariat 2023 Available

Labour-based contract for upgrade of Games Village for Pacific Games 2023
King George the Sixth Secondary School
Carpentry Works for Mendana Boys Dormitory

- Mobilization Payment 1 - 20%
- Payment 2 - (35%) of total payment for 50% Completion of work
- Payment 3 - (35%) for Completion of work
-Retention payment 10% after satisfaction of 3 months defect liability period

There are no comments on this title.

to post a comment.

Copyright @ NHA PG2023 Library
Honiara, Solomon Islands

_______________________________________________________________________________________________________

Proudly Designed And Developed by:
Umi Solomons, Honiara, Solomon Islands
Email:: info@umisolomons.com