Sports City Precinct - National Stadium Project - Central South Architectural Design Institute (CSADI) / National Hosting Authority
Material type:
TextPublication details: Honiara, Solomons Islands : National Hosting AuthoritySubject(s):
| Item type | Current library | Collection | Shelving location | Call number | Materials specified | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|---|---|
Folder
|
NHA Pacific Games 2023 Library | Secretariat | Cabinet 20 - Drawer A | 1/1/15/2 (Browse shelf(Opens below)) | Available |
Browsing NHA Pacific Games 2023 Library shelves, Shelving location: Cabinet 20 - Drawer A, Collection: Secretariat Close shelf browser (Hides shelf browser)
Diplomatic Note - Scoping Mission to Solomon Islands
The Stadium Project of Solomon Islands 2023 Pacific Games - (1) Rendering (2) Planning Design (3) Architecture Design – October 05 2020
Practice Track and Football Field Site Acceptance Memorandum signed April 8 2022Minutes of Meeting between CSADI & RSIPF on the 2023 PG Stadium Project – Oct 14 2020
Minutes of Meeting between CSADI & RSIPF - October 2020
Minutes of meeting of professional investigation on 2023 PG stadium Project - Oct 16 2020
2023 PG Stadium Project Description of Conceptual Design
Final discussions on Preliminary design Dec 21 2020
Note No. 092/2021 – Payment
Letter of Authorisation dated March 31 2021 – Mr. Ruan Xiangju appointment
Acceptance of the Technical Plan & Division of Responsibilities of China Aid Project on Sports Technical Assistance to Solomon Islands - Feb 17 2023
Handover certificate of the 2023 Pacific Games Stadium Project between SIG & PRC signed Aug 18 2023
There are no comments on this title.
