3D Construction Ltd. / National Hosting Authority,

Material type: TextTextPublication details: Honiara, Solomons Islands : National Hosting Authority, 2022-2023Subject(s): Online resources:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Shelving location Call number Materials specified Status Date due Barcode
E-File E-File NHA Pacific Games 2023 Library Secretariat eLibrary 2022 Available
Folder Folder NHA Pacific Games 2023 Library Secretariat Cabinet 19 - Drawer B 1/3/5/3DC (Browse shelf(Opens below)) 2022 Available
Browsing NHA Pacific Games 2023 Library shelves, Shelving location: Cabinet 19 - Drawer B, Collection: Secretariat Close shelf browser (Hides shelf browser)
1/3/5/3DC 3D Construction Ltd. / 1/3/5/ALR Alrico Timbers / 1/3/5/ALR Alrico Construction / 1/3/5/ARK ARKAD General Construction /

Payment 1 - 20% Mobilization Payment for Labor based Contract
Payment 2 - 35% Payment for 50% of work done as per amended payment Schedule of the Contract
Payment 3 - 35% For completion of work
Payment 4 - Variation 1 - Additional carpentry works done to Building 3
Payment 5 - 10% Retention
Upgrade of Schools - GTB-GFC 09/22.
LOT 1 - Carpentry Works for Building 3 -Boys Dormitory &Classroom at St. Joseph Tenaru.

There are no comments on this title.

to post a comment.

Copyright @ NHA PG2023 Library
Honiara, Solomon Islands

_______________________________________________________________________________________________________

Proudly Designed And Developed by:
Umi Solomons, Honiara, Solomon Islands
Email:: info@umisolomons.com