BJAY Engineering / National Hosting Authority
Material type:
TextPublication details: Honiara, Solomons Islands : National Hosting Authority, 2023Subject(s): Online resources:
| Item type | Current library | Collection | Shelving location | Call number | Materials specified | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|---|---|
E-File
|
NHA Pacific Games 2023 Library | Secretariat | eLibrary | 2023 | Available | ||||
Folder
|
NHA Pacific Games 2023 Library | Secretariat | Cabinet 19 - Drawer B | 1/3/5/BJA (Browse shelf(Opens below)) | 2023 | Available |
Browsing NHA Pacific Games 2023 Library shelves, Shelving location: Cabinet 19 - Drawer B, Collection: Secretariat Close shelf browser (Hides shelf browser)
| 1/3/5/AVC AVCON Limited / | 1/3/5/B2C B2 Construction. / | 1/3/5/BES Best Builders / | 1/3/5/BJA BJAY Engineering / | 1/3/5/BKC BK Construction / | 1/3/5/BKC BK Construction / | 1/3/5/BLI Blind Knot Construction / |
Payment 1 - 20% Mobilization Payment for Labor based Contract
Payment 2 - 35% Payment for 50% of work
Variation 1
Variation 2
Payment 3 - 35% For completion of work
Payment 4 - 10% Retention
Labour Based Contract for Upgrade of Games Village for Pacific Games 2023 - GTB-GFC 09/22.
Lot 6 -Don Bosco Institute of Technology - Electrical Works for Building 1 Classroom & Ablution Block
There are no comments on this title.
Log in to your account to post a comment.
